Replacement of  Bridge No. SUM-271-8.02 Over Cuyahoga River Valley, Summit County,Ohio Other Projects...                               

 Airports:

        Cleveland Hopkins
        International Airport:

  • Relocation of Brook Park Road
  • Relocation of Old Grayton Road
  • Long Term Parking Garage Improvements
  • Runway 10-28 Safety Improvements
  • Additional Geotech Services for Runway 10-28 Safety Improvements
  • Improvement of Parking Spaces For Lot 6
  • Long term parking and Parking Lot Improvements

 

 

          Akron-Canton 
        Regional Airport:

  • Proposed Concourse Expansion
  • Terminal Building & Taxiway Construction Inspection
  • Concourse Replacement Inspection
  • Runway 5-23 Safety Area Improvement
  • Instrumentation & Monitoring
  • Runway 5-23 Additional Geotech Services
  • Strausser Road Slope Stability Investigation
  • RW 5-23, Taxiway E, and Taxiway F Pavement Rehabilitation

 

          Port Columbus
        International Airport:

  • Construction of Concrete Pads at Air Cargo Building
  • Pavement Rehabilitation at Air Cargo Building
  • Pavement Rehabilitation at Air Cargo Building
  • Pavement Rehabilitation at Air Cargo Building
  • Taxiway E Rehabilitation/ Safety Corrections
  • PaveConstruction Inspection of Ment at Air Cargo Building
  • Asphalt Plant and Field Inspection for Taxiway E Rehabilitation/ Safety Corrections

 

 

 

 

 

Greater Cleveland
Rapid Transit Authoriy (GCRTA):
  • Rehabilitation of West 53rd Street Bridge over the GCRTA RR
  • Rehabilitation of Aetna Road Bridge over the GCRTA RR
  • Rehabilitation of Avery Road Bridge over the GCRTA RR
  • Rehabilitation of West 74th Street Bridge over GCRTA
  • Rehabilitation of the GCRTA Bridge over Carlyon Street
  • Rehabilitation of the West 77th Street Bridge over the GCRTA RR
  • Replacement of the E. 121st Street Bridge over GCRTA RR
  • E. 118th Street/Wade Park Bus Loop Replacement
  • Rocky River Bus Loop Replacement
  • Rockefeller Avenue Bridge over the GCRTA RR
  • Westlake Park-n-Ride Lot Expansion
  • GCRTA Transit Tunnel Rehabilitation
  • Rehabilitation of the GCRTA Bridge over East Boulevard (MLK)
  • Proposed Mayfield RTA Station
  • Proposed Canopy at the             Stephanie Tubbs Jones Transit Center
  • Proposed AT&T Utility Bridge over GCRTA RR
  • Rehabilitation of the GCRTA S Curve
  • Rehabilitation of W. 74th Street Bridge over the GCRTA RR
  • Rehabilitation of W. 61th Street Bridge over the GCRTA RR
  • GCRTA Brookpark Tower Building
  • GCRTA Proposed Mayfield Road RTA Transit Station

North East Ohio Regional Sewer District (NEORSD):


  • S.W. Quadrant Water Main
  • Timber Trail Sanitary Sewer
  • N. Parkway Outfall Sewer
  • SOM Center Rd. IC Relief Sewer
  • NEORS Parking Lot Rehabilitation
  • NEORSD Parking Lot Rehabilitation
  • NEORSD Woodland Ave Sewer Seperation



Ohio Turnpike Commision:

  • Proposed I-77/SR 21/I-80 Interchange
  • Construction Inspection of I-  77/SR 21/I-80 Interchange
  • Toll Plaza (Exit 11) Relocation
                                                                                    Back to Top   Home Page
Website Builder